Faculty profile
Hooman Askari-Nasab
Back to facultyThis profile is built from public research funding records (CIHR, NSERC and SSHRC) and PubMed. We have not imported them from a University of Alberta directory, so their courses and email address may be missing. Find their university profile.
Research
Latest papers
State-of-the-art optimization methods for short-term mine planning.
F1000Research · 2024 · senior author
Latest funding
- $50,000
Sustainable Development - Integrated Mine Planning Optimization in the Presence of Operational Uncertainty
NSERC · 2024 · Principal investigator
- $450,000
Mine Haulage Network Simulation-Optimization
NSERC · 2023 · Principal investigator
- $600,000
Dynamic In-Pit Crusher Location Optimization in the Presence of Operational Uncertainty
NSERC · 2019 · Principal investigator
1 publications.
State-of-the-art optimization methods for short-term mine planning.
Kambala Malundamene M, Habib NA, Soulaimani S, Abdessamad K, Askari-Nasab H
Sustainable Development - Integrated Mine Planning Optimization in the Presence of Operational Uncertainty
Principal investigators: Askari-Nasab, Hooman
Keywords: mining engineering; mine planning; mining operational excellence; reserve estimation; sustainable resource development
Mine Haulage Network Simulation-Optimization
Principal investigators: Askari-Nasab, Hooman H
Keywords: discrete event simulation; haulage and loading; long-term mine planning; mine operational planning; mining fleet management systems; oil sands mining; open pit mining; short-term mine planning; simulation of mining systems; surface mining
Dynamic In-Pit Crusher Location Optimization in the Presence of Operational Uncertainty
Principal investigators: Askari-Nasab, Hooman H
Sustainable Mineral Development- A Theoretical Paradigm for Compliance of Strategic and Short-term Mine Plans
Principal investigators: Askari-Nasab, Hooman
Mining Optimization Laboratory Technical Seminar with Web Conferencing Option
Principal investigators: AskariNasab, Hooman
Integrated optimal haulage network for oil sands mine production scheduling
Principal investigators: AskariNasab, Hooman
Sustainable Resource Development - A Theoretical Framework for Integrating Environmental Impact Assessment into Life-of-Mine Planning Optimization
Principal investigators: AskariNasab, Hooman
Optimization of resource extraction planning and environmental performance, Vale
Principal investigators: AskariNasab, Hooman
Development of a proposal for block cave mine scheduling with Gemcom Software International Inc.
Principal investigators: AskariNasab, Hooman
CRD proposal development for linkage of mine and tailings plans in oil sands and visiting Suncor Energy mine site
Principal investigators: AskariNasab, Hooman
From CIHR, NSERC and SSHRC funding decisions: CIHR since 2008, NSERC since 1991 and SSHRC since 1998, including their latest published competition results.
A short, specific email works best. This draft uses one of their recent papers; replace the parts in brackets with your own details before sending.