Faculty profile
Ming Lu
Back to facultyThis profile is built from public research funding records (CIHR, NSERC and SSHRC). We have not imported them from a University of Alberta directory, so their publications, courses and email address may be missing. Find their university profile.
Latest funding
- $76,000
AI-Enabled Next-Generation Project Planning and Scheduling Methods for Construction in Northern and Remote Regions
NSERC · 2023 · Principal investigator
- $870,000
Construction-oriented digital twins for multi-dimensional production planning and control
NSERC · 2022 · Co-investigator
- $177,000
Structural steel project development integrating structural design and construction engineering: quantitative methods and AI-based tools
NSERC · 2022 · Co-investigator
AI-Enabled Next-Generation Project Planning and Scheduling Methods for Construction in Northern and Remote Regions
Principal investigators: Lu, Ming
Keywords: construction in northern and remote regions; construction engineering and management; project planning and scheduling; construction operations engineering; materials logistics; construction methods and materials; seasonal cycles; environmental constraints; risk mitigation; optimization
Construction-oriented digital twins for multi-dimensional production planning and control
Principal investigators: Mohamed, Yasser Y
Keywords: construction management; lean construction; project forecasting; project planning and control; project productivity; project risk; sustainability and waste reduction
Structural steel project development integrating structural design and construction engineering: quantitative methods and AI-based tools
Principal investigators: Imanpour, Ali AI
Keywords: Artificial Intelligence; Constructability; Construction management; Construction projects; Decision-making support tools; Erection of structul steel; Steel construction; Steel fabrication; Steel shop production planning; Structural design
Data investigation and analytics development in support of plant maintenance operations planning
Principal investigators: Lu, Ming
Cost and schedule comparison and risk analysis for pile foundation systems
Principal investigators: Lu, Ming
Enhancing Regression-based Analytics for Addressing Applied Research Needs in Construction Engineering & Management (CEM)
Principal investigators: Lu, Ming
Data-driven decision support systems for integrated project delivery on structural steel projects
Principal investigators: Lu, Ming
Cost Analyses of Pile Foundation Systems based on Engineering Design and Construction Method
Principal investigators: Lu, Ming
Simulation-based analytics for industrial construction
Principal investigators: AbouRizk, Simaan
Development of next-generation methodologies of resource scheduling, augmented reality visualization, and resource tracking for construction project management
Principal investigators: Lu, Ming
From CIHR, NSERC and SSHRC funding decisions: CIHR since 2008, NSERC since 1991 and SSHRC since 1998, including their latest published competition results.
A short, specific email works best. This draft uses one of their recent papers; replace the parts in brackets with your own details before sending.