Faculty profile
Sang Han
Back to facultyThis profile is built from public research funding records (CIHR, NSERC and SSHRC). We have not imported them from a Concordia University directory, so their publications, courses and email address may be missing. Find their university profile.
Research
Latest funding
- $22,340
Integrated data-driven approach with AI for proactive and preventive strategies of crane accidents
NSERC · 2024 · Principal investigator
- $69,570
Improving scheduling process of supply chain in panelized construction
NSERC · 2023 · Principal investigator
- $715,114
Industrialization and Decarbonization of the Construction Process
NSERC · 2022 · Co-investigator
Integrated data-driven approach with AI for proactive and preventive strategies of crane accidents
Principal investigators: Han, Sang Hyeok
Keywords: Construction, transportation and communications
Improving scheduling process of supply chain in panelized construction
Principal investigators: Han, Sang Hyeok SH
Keywords: agent-based simulation; automated system; construction manufacturing; modular construction; optimization; panelized construction; performance diagnosis; resource utilization; scheduling process; supply chain
Industrialization and Decarbonization of the Construction Process
Principal investigators: Al-Hussein, Mohamed M
Keywords: automation; co2 emissions; construction manufacturing; decarbonization; energy-efficiency; exportable building components; housing affordability; modular construction; offsite construction; robotics
Crane operation assisted planning and optimization
Principal investigators: Bouferguene, Ahmed A
Keywords: Automation; Bidding process; Crane mat; Crane operational planning; Crane rigging design; Crane selection; Ground bearing pressure; Heavy industrial construction; Modular construction; Optimization
A joint, interdisciplinary, advanced ergonomics research facility for motion capture, 3D imaging and virtual reality
Principal investigators: Li, Xinming
Digitization of Scaffolding Management Processes in Construction Projects_x000d_ _x000d_ _x000d_
Principal investigators: Lei, Zhen
A Physical demand-driven design system in modular construction
Principal investigators: Han, Sang Hyeok
Keywords: Design and Process Improvement; Intelligent; Modular Construction; Optimization; Physical Demands; Productivity; Safety; Simulation; Virtual Model; Waste
Design, selection, and management of modular crane rigging for heavy industrial projects
Principal investigators: Bouferguene, Ahmed
Improving mobile crane operational cost for the heavy construction industry
Principal investigators: Bouferguene, Ahmed
From CIHR, NSERC and SSHRC funding decisions: CIHR since 2008, NSERC since 1991 and SSHRC since 1998, including their latest published competition results.
A short, specific email works best. This draft uses one of their recent papers; replace the parts in brackets with your own details before sending.