This profile is built from public research funding records (CIHR, NSERC and SSHRC) and PubMed. We have not imported them from a University of Guelph directory, so their courses and email address may be missing. Find their university profile.
Research
Latest papers
Expanding Poly(lactic acid) (PLA) and Polyhydroxyalkanoates (PHAs) Applications: A Review on Modifications and Effects.
Polymers · 2021
Latest funding
- $30,000
Integrated Master Production Planning and Operation Scheduling for a Resource Constrained Multi-Product Project Based Manufacturing
NSERC · 2023 · Principal investigator
- $84,000
Digital-twin driven integrated production scheduling, rescheduling and supervisory control for Industry 4.0
NSERC · 2023 · Principal investigator
- $20,000
Development of a cloud-based digital twin simulation platform for flexible manufacturing systems with IoT technology
NSERC · 2020 · Co-investigator
1 publications.
Expanding Poly(lactic acid) (PLA) and Polyhydroxyalkanoates (PHAs) Applications: A Review on Modifications and Effects.
Naser AZ, Deiab I, Defersha F, Yang S
Integrated Master Production Planning and Operation Scheduling for a Resource Constrained Multi-Product Project Based Manufacturing
Principal investigators: Defersha, Fantahun FM
Keywords: Algorithm; Manufacturing Scheduling; Production Planning; Project-based manufacturing; Software
Digital-twin driven integrated production scheduling, rescheduling and supervisory control for Industry 4.0
Principal investigators: Defersha, Fantahun
Keywords: manufacturing systems; dynamic scheduling; digital twin; manufacturing systems simulation; cyber-physical system; internet of things and services; metaheuristics; evolutionary algorithms; local search
Development of a cloud-based digital twin simulation platform for flexible manufacturing systems with IoT technology
Principal investigators: Yang, Sheng
A Comprehensive Framework and Solution Procedure for Dynamic Scheduling in Manufacturing Systems
Principal investigators: Defersha, Fantahun
Production and Manpower Scheduling
Principal investigators: Defersha, Fantahun
Integrated Production and Manpower Scheduling - Second Phase
Principal investigators: Defersha, Fantahun
Integrated production and manpower scheduling
Principal investigators: Defersha, Fantahun
Solving non-conventional scheduling problem in a complex automated paint line
Principal investigators: Defersha, Fantahun
Design and implementation of integrated quality management system
Principal investigators: Defersha, Fantahun
Virtual Prototyping of Reconfigurable Manufacturing Systems
Principal investigators: Defersha, Fantahun
From CIHR, NSERC and SSHRC funding decisions: CIHR since 2008, NSERC since 1991 and SSHRC since 1998, including their latest published competition results.
Frequent collaborators
- Fantahun Defersha and Ibrahim Deiab: 1 shared paper
- Fantahun Defersha and Sheng Yang: 1 shared paper
- Ibrahim Deiab and Sheng Yang: 1 shared paper
- School of Engineering
Co-authors at University of Guelph, colored by department. Thicker lines mean more shared papers; select anyone to open their profile and their own map.
A short, specific email works best. This draft uses one of their recent papers; replace the parts in brackets with your own details before sending.